{SAMPLE PROJECTS} PRIVATE VILLA  [RIYADH]

                   

[8] MINIPILING OF FOUNDATIONS OF A PRIVATE VILLA IN RIYADH

 

Turki Al-Ghashyan Establishment based in Riyadh appointed Bullivant Arabia Ltd. to inspect and investigate the cause of cracks in the walls of the newly constructed villa on the front portion.

Based on the information provided by the client, and as per the drawings available, the entire building rests on a single raft foundation of 40cms thickness with an additional depth of 20cms below the external walls. The suspected problem was the settlement of the backfilled soil below the mat foundations. The objective of our study was to diagnose the causes of the cracks and verify the adequacy of the existing foundation system and the superstructure and to provide recommendations on the method of strengthening the structure, if necessary.

The results of investigation carried out revealed that the cracks in the walls were developed due to the differential settlement of poor backfill material below the raft foundation. A competent solution to overcome the problem of active settlement was to support the raft on minipiles. A total of 153 piles of 150mm diameter were distributed accordingly, depending on the load distribution over the raft. The construction and installation of these piles was done by Bullivant Arabia Ltd. Pressure grouting was also done to fill the cavities developed under the raft foundation.


 

Click on Image to view large

 

 

 

 

 


Click on Image to view  large

     

Home  About Us  |  Clients  |  Downloads  |  Online Queries  |  Services  |  Contacts

Copyrights reserved by www.bullivantarabia.com [© Powered by: eMiT Solutions]